Enterprise Data Center Cape Town

Home Projects

Enterprise Data Center Cape Town

State-of-the-art enterprise data center facility with redundant power, cooling, and network infrastructure supporting critical business operations.

Schneider Electric UPSLiebert Cooling SystemsCisco Network InfrastructureAPC Power DistributionEnvironmental MonitoringFire Suppression SystemsAccess Control SystemsDCIM Software

Client

Financial Services Group

Location

Cape Town, South Africa

Project Value

R 120 Million

Duration

Ongoing

Enterprise Data Center Cape Town

Project Overview

Our enterprise data center project in Cape Town delivers world-class infrastructure supporting mission-critical applications for major financial institutions and technology companies. The facility features Tier III+ design standards with 99.99% uptime guarantee, redundant power systems, and advanced cooling technologies. The 5,000 square meter facility houses over 200 server racks with capacity for 2MW of IT load. Advanced monitoring systems provide real-time visibility into power, cooling, and environmental conditions. The facility incorporates sustainable design principles with energy-efficient cooling systems and renewable energy integration. Security features include biometric access controls, 24/7 surveillance, and multi-layered physical security measures. The data center serves as a regional hub for cloud services, disaster recovery, and high-performance computing applications.
Key Components

Project Features

Discover the key features and components that make this project exceptional

01

Redundant Power Systems

N+1 UPS configuration with diesel generators and automatic transfer switches ensuring continuous power supply.

02

Advanced Cooling

Precision air conditioning with hot/cold aisle containment and free cooling economizers for energy efficiency.

03

Network Connectivity

Multiple fiber providers with diverse routing ensuring high-speed, redundant internet connectivity.

04

Physical Security

Multi-layered security with biometric access, surveillance systems, and 24/7 security personnel.

05

Environmental Monitoring

Real-time monitoring of temperature, humidity, power, and environmental conditions with automated alerts.

Project Journey

Project Timeline

Follow the journey of this project from conception to completion

Phase 18 months

Design & Planning

Architectural design, engineering specifications, and regulatory approvals.

Phase 218 months

Construction & Build-out

Facility construction, power infrastructure, and cooling system installation.

Phase 36 months

Equipment Installation

Server racks, network equipment, and monitoring system deployment.

Phase 43 months

Testing & Commissioning

System testing, certification, and operational readiness verification.

Technology Stack

Technologies Used

The cutting-edge technologies that powered this project

Schneider Electric UPSLiebert Cooling SystemsCisco Network InfrastructureAPC Power DistributionEnvironmental MonitoringFire Suppression SystemsAccess Control SystemsDCIM Software
Measurable Results

Project Impact

The quantifiable impact and results achieved through this project

99.99%

Uptime Guarantee

200+

Server Racks

2MW

IT Load Capacity

5,000m²

Facility Size